[IN THE SACRAMENTO VALLEY & THE LAKE TAHOE BASIN] 1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 7.5 MI EAST OF RIVERTON /AT SAND FLAT CAMPGROUND/ TO 5.9 MI WEST OF STRAWBERRY /AT 36 MILE STONE RD/ (EL DORADO CO) FROM 0700 HRS TO 1700 HRS TUESDAY THRU THURSDAY THRU 4/12/18 - DUE TO CONSTRUCTION 1-WAY CONTROLLED TRAFFIC AT VARIOUS LOCATIONS FROM 7.7 MI WEST TO 7 MI WEST OF THE JCT OF SR 89 /AT ALPINE AVE/ (EL DORADO CO) FROM 0700 HRS TO 1800 HRS WEDNESDAY THRU FRIDAY THRU 4/13/18 - DUE TO MAINTENANCE